Drywall is going up, but
notice only on one side to allow for electrical and plumbing inspections.
Tuesday, May 22, 2012
Gilsey House: Electrical and Plumbing
All of the studs are in. At this point the plumber and
electrician run their lines.
In particular, running the sprinkler lines requires careful
routing and coordination.
Gilsey House: Full Scale Floor Plan
Now that the floors are level, the contractor lays out the
walls using the steel track that will eventually hold the studs.
In the process we discovered that the
dimensions of the gallery, master bath, and laundry room would need to be
adjusted. The client decided to
eliminate a small coat closet to make a larger master shower.